|
|
ASP II System for LRT track
Home >
Innovation >
Applications >
ASP II System for LRT track
In the field of urban transports, SATEBA has developped anti-vibratile solutions like the ASP II system
Equipment in Factory
 1-Manufacturing of the sleeper and fitting of screw bolts and central bolt. |  2-Equip with base plates and compress the anti-vibration Sylomer pad |  3-Fit protective covers. Deliver equipped sleeper to site. |
Equipment on worksite
 4-Fit the 35G rail and Nabla fastenings |  5 – Fit alveolar fishplates after pre-cutting of the dedicated areas for the access to fastening. Fit protective covers. |
 Final view of the track after filling of concrete.
Main projects :
- Lyon line 1 and 2 - Montpellier, Line1 - Strasbourg, Line B |  ASP II Track laying, Place de la Comédie in Montpellier |
|
 |