Home
Presentation of company and products
References
Railway networks
LRT tracks
Meteor
England CTRL Stage 1
Quality Insurance
Innovation
International
England CTRL Stage 1
Home >  References >  England CTRL Stage 1

SATEBA’s knowledge and technical expertise was used in partnership with precast concrete products manufacturer STANTON BONNA to supply Amec Spie Rail with 283, 000 twin block sleepers for the first high speed section of the project running from the channel tunnel to London.

This section opened in September 2003 and has reduced the travel time from Paris to London by 20 minutes

Link : STANTON BONNA

Also read :
Railway networks LRT tracks Meteor
copyright (c) Sateba / Bonna Sabla 2003 - all rights reserved